
High-performance piling rigs and construction equipment ready to support foundation, infrastructure, and civil engineering projects. Certified, well-maintained, ready to deploy.
3
Machine Models
75t
Max Lifting Capacity
69m
Max Drilling Depth
UAE
Based in Dubai
Three certified pile machine models ready for deployment across Dubai and the UAE.

Rotary Drilling Rig
Max Drilling Dia.
2,000 mm
Max Depth
69 m
Rated Power
277 kW
Operating Weight
78 t
The all-round master — superior performance for drilling rocks and soil. High-powered engine, low fuel consumption, high torque.

Crawler Crane Series
Max Lifting Cap.
75 t
Boom Length
12–57 m
Rated Power
212 kW
Machine Weight
67 t
75-tonne lifting capacity for the heaviest foundation work. ISUZU engine, massive boom reach, proven reliability on demanding UAE sites.

Rotary Drilling Rig
Max Drilling Dia.
2,000 mm
Max Depth
68 m
Rated Torque
235 kN·m
Operating Weight
81 t
Clay expert and faster — high soil dumping speed, intelligent 10-inch HD touchscreen, single layer drum for long service life.
Additional construction machinery available on request — contact us to check availability and rates.

Heavy Haulage

Cargo Transport

Lifting Equipment

Earthmoving Equipment

Backhoe Loader

Skid Steer Loader
We don't just rent machines. We deliver complete foundation solutions backed by expertise.
Quick mobilization. Our team ensures machines are on your site on schedule — because downtime isn't an option.
Rigorous maintenance schedules. Every unit is in peak operating condition before it reaches your project.
Full certification and compliance documentation meeting UAE construction safety standards.
Leading construction companies across Dubai rely on SCS for their foundation equipment needs.
Competitive rates from short-term to long-term. Tailored to your project timeline and budget.
Our team assists with equipment selection, on-site support, and resolves issues fast throughout your rental.
Tell us about your project and we'll respond with competitive rates and availability — typically within 2 hours.